Edit the English: 玄燁 (paragraph 595)
The English was translated by the site from the original and may have mistakes. Anybody can change it, signed in or not, and a change shows at once; every version is kept and can be put back. The original cannot be changed here.
Original paragraph 595 of 809
八月壬辰,高家堰車邏壩澗河河堤告成。
English
Versions
-
Current
First draft (written by the site from the original) 113 characters
In the eighth month, on renchen, the embankments of the Jian River at the Cheluo Dam of Gaojiayan were completed.